Visuel agriculture

Case studies

Helping water operators to improve and upgrade the performance of their networks: this is the mission of Claire Group. Read these case studies to discover our areas of expertise, which include the supply of equipment, custom solutions, monitoring and control systems.

Port de Lézardrieux 003
Port of Lézardrieux

Project: Port of Lézardrieux

The water supply network serving the port’s seven jetties is exposed to harsh natural conditions and also comprises numerous...
Pont de Cocody Côte d'Ivoire
Côte d’Ivoire National office for drinking water (ONEP)

Reducing water consumption in administrative entities in Côte d’Ivoire

Confronted with poor network efficiency (less than 50%) across the administrative entities of Côte d’Ivoire, ONEP wanted to optimise...
Fontgombault regional water authority

Customer testimonial: Fontgombault regional water authority

With ageing infrastructures and less efficient flow regulation equipment in the drinking water network, the water authority was experiencing...
AVEYRON WATER AUTHORITY

Installing a connected chamber for automated VCM regulation and purging

The Aveyron water authority was recording VCM levels which were above the European regulatory limit. To restore the quality...
Chantier OMEGAFLEX
Local water authority in Dordogne

A hybrid connection solution for the management of PE networks

The authority installs all its new connections by electro-welding, but for resource management purposes is looking to improve the...
Groupe Claire ville Alger réseau eau
City of Algiers

Building a custom part to repair a distribution pipe in Algiers

The city council wanted to identify the weak points in its network and needed the equipment, expertise and responsiveness...